top of page

Building Statistics

Project Information:

Name:                                                                                 Penn State University Chemical & Biomedical Engineering Building

Location:                                                                                                                                                            State College, PA

Building Function:                                                                                                                                                       Educational
Size:                                                                                                                                                                              194500 SF
Start-Finish:                                                                                                                                     Sept. 2016 - Nov. 22nd 2018 
Cost:                                                                                                                                              $119 million Construction cost
Number of stories:                                                                                                                            5 stories above and 1 below

Project Delivery Method:                                                                                                                                       Design - Assist

Cost:                                                                                             $119 million Construction cost, $150 million project total cost

Project Team

Penn State University
           Owner
            Barton Malow
Construction Management
            Hok Architects, Inc
                    Architect
            Southland Industry
                       MEP
Baker, Ingram & Associates
             Structural
            Forum Studio
      Landscape Architects
           Sweetland Engineering
                   Civil Engineers
                      Vanderweil
                   MEP Engineers

 

Architecture:

  • The University put the new home for two of our distinguished departments: Chemical Engineering and Biomedical Engineering.

  • 5’’/7’’ Unitized Curtain Wall system with vision glass and spandrel glass to allow the building to have an open feeling to public. The brick and stone veneer system together to form the façades that reflect the campus architecture with humble. As a feature, the Dow Chemical Knowledge Commons is designed to have peer-to-peer interactions between each other.  

  • The design is to meet the requirement of the right place to bring their eager for knowledge, their ideas and creativity, their passion for teaching learning. The innovative idea of having a big cantilever section on the North-East wing makes people curious.

Major National Model Codes   

     

  • IBC

  • IEBC

  • IPMC

  • NEC

  • IPC

  • IEBA

  • IAC

  • International Energy Conservation Code

  • Life Safety Code – NFPA 101-2000 including reference codes

  • Office of the State Fire Marshall Administrative Rules

  • City of Chicago Building Code Sections

  • UIC Building Standards

Zoning:

  • UPD Sub-district 5 Zoning District

Building Enclousre:

Facade:

  • The building envelope system for Chemical & Biomedical Engineering Building consists of 5’’/7’’ Curtainwall system, 1’’insulating glass unit, with typical brick cavity wall inside. The north elevation is full of glass curtain wall assemblies. The south of the building utilizes brick and stone veneers to have strip windows in between. The unitized curtain wall system is 4-sided silicone glazed 7’’/5’’ deep with vision glass and spandrel glass. Aluminum plate and Zinc panel are mainly used as the rain screen. The curtain wall system really gives the building an open feeling towards public and welcoming them to interact within the space. The brickand stone veneer in the façade fit in to the campus architecture with humble.

Roofing:  

     

  • The floor height of the Chemical & Biomedical Engineering building is 16’ 8’’ and the penthouse has a 27’ floor height. The roofing has 5/8’’ pressure treated exterior plywood with Aluminum coping.   The next layer is the roof membrane locates above the 5/8’’ exterior sheathing. Rigid insulation as well as 2-piece of counter flashing are used for roofing.

Sustainability:

     

  • A goal of LEED Gold certification is to be achieved by this building. A large amount of curtain wall systems to be used on this project can provide adequate natural lighting as well as thermal conduction. What really earned a lot of points for LEED is the MEP system. A lot of prefabrication was required for the MEP and Electrical system to ensure the quality and sustainability in the future. The MEP system alone itself is over $50 million, and the energy recovering units really do the job well.  

Building Statics Part 1 & 2

  • LinkedIn B&W
  • Facebook B&W
  • Google+ B&W

Note: While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Peng Li. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.

   e-Studio             Penn State             AE             AE Computer Labs              Contact

bottom of page